Project Description
The purpose of this project was to reduce cut-through traffic from the Sellwood Bridge onto neighborhood streets. Traffic congestion related to the Sellwood Bridge creates incentives for people driving to use local streets adjacent to SE Tacoma St as cut-through routes. The project proposed the installation of speed bumps on six local streets both north and south of SE Tacoma St to discourage their use by non-local traffic and reduce associated speeding.
Construction Year: Summer/Fall 2019
Current Phase: Complete
Total Project Budget: To be determined (< $100,000)
Project Map
Project Manager Information:
Dan Layden
503.823.2804